Copyright ©2019     Shandong Hanlong Machinery Manufacturing Co.,Ltd.         All Right Reserved  

PRODUCTS

Dryer equipment
Product name

Dryer equipment

没有此类产品
Product description

1. Product Introduction:

The dryer equipment is mainly composed of a hot blast stove, a screw feeder, a buffer tank, a duct, a fan, a cyclone , etc., and the airflow is generated by the negative pressure of the fan, and the material enters the air passage through the screw feeder, and the hot air The materials are mixed and the water and materials are separated by cyclone to achieve the drying effect.

2.Application:

(a) All kinds of powder material

(b) The fuel factory,

(c) Fertilizer factory

(d) Chemical factory,

(e) Medicine factory and so on.

3. Drying Process:

Crusher machine---Cutting machine---Drying machine---Granulator machine---Cooling machine---Baler

 

4.Product specification

Type

Evaporation(t/h)

Power(kw)

GHGφ1.0×6×1

0.1-0.2

4.0+7.5+2.2

GHGφ1.0×12×1

0.18-0.28

5.5+7.5+2.2

GHGφ1.2×12×1

0.27-0.54

5.5+7.5+3.0

GHGφ1.4×12×1

0.37-0.74

5.5+11+3.0

GHGφ1.5×12×1

0.42-0.85

5.5+15+4.0

GHGφ1.6×12×1

0.48-0.96

5.5+18.5+4.0

GHGφ1.6×24×1

1.1-1.2

7.5+22+5.5

GHGφ1.8×12×1

0.8

7.5+18.5+4.0

GHGφ1.8×12×3

1

11+30+5.5

GHGφ1.8×24×3

1.22-2.44

11+30+4.0

GHGφ2.0×12×1

1.2

7.5+22+11

GHGφ2.0×12×3

1.5

11+45+5.5

GHGφ2.0×24×1

1.51-3.01

15+37+7.5

GHGφ2.2×12×1

1.2

11+22+4.0

GHGφ2.2×12×3

1.5

11+45

GHGφ2.0×24×3

1.82-3.65

7.5+37

GHGφ2.5×12×1

1.5

15+22+4.0

GHGφ2.5×12×3

1.8

18.5+45

GHGφ2.5×24×1

2.36-4.71

15+37

GHGφ2.8×12×1

1.8

18.5+30+4

GHGφ2.8×24×1

2.95-5.91

22+45

GHGφ3.0×11×1

1.5

22+45+4

GHGφ3.0×24×1

3.39-6.78

22+45

GHGφ3.5×12×1

1.6

30+45+5.5

GHGφ3.5×24×1

4.62-9.23

55+55

 

5.Transportation shipment:

7.Certification:

8. FAQ

Q: Are you trading company or manufacturer?

A: We are manufacturer.

Q:How long is your products' lifetime?

A:Products' life time is based on the working condition,pls tell us your working condition, let us give you

more technical suggestion.

Q:Could you do OEM and ODM.

A:Certainly, welcome ODM and OEM.

Q:What is the delivery time?

A:In general, usually our delivery time is 30 days, while we could arrange the producing scheduling as customer requirements.

Q:What is the payment term accept?

A:30%T/T in advance, the balance pay off before delivery.

Corresponding parameter set not found, please add it in property template of background
暂未实现,敬请期待
暂未实现,敬请期待
Previous article
Next article